DONG Energy is pursuing efforts to find the Gunfleet Sands Wind Farm constructor.

This offshore wind farm engineering contract consists of adjustment of J-tubes and tightening of immersed seals on offshore wind farm(s).

Contractor is responsible for:

– Development, production and test of tool to raise and adjust the J-tubes at hang-off;

– Adjusting J-tubes at hang-off, tightening seals at seabed and installing constraint system on J-tubes at lower internal platform;

– Optional (diving) inspections before and/or after the above mentioned work may be included;

– Preparation of risk analysis and method statements for the work;

– Provision of vessels in connection with the work.

These services will be performed on the Gunfleet Sands Wind Farms, UK in 2012 and eventually on other offshore wind farms in Denmark and/or UK.

The Project period is 12 months from the date of contract award.

Gunfleet Sands Offshore Wind Farm consists of two phases, Gunfleet Sands 1 and 2.

The total capacity of the offshore wind farm is 172MW. Gunfleet Sands 1 consists of 30 turbines each of 3.6MW and Gunfleet Sands 2 consists of 18 turbines each with a capacity of 3.6MW.